21 labourers can build a wall in 25 days. If 14 additional labourers are employed, then in how many days the work can be completed ?

D. 15 DAYS
Posted in:  Time & Work -  Aptitude -  Mathematics

A report of 100 pages is to be typed by three typists.
Typist A can type 100 pages in 10 hours.
Typist B can type the same pages in 20 hours. and 
Typist C can type in 25 hours,
All the three typist started typing at 09:00 A.M. At 01:00 P.M., Typist A stopped typing. The other two typist finished the job Approximately at what time the report was typed ?

B. 03:40 P.M.
Posted in:  Time & Work -  Aptitude -  Mathematics

Three men A, B, C together completed a work, A worked for 5 days, B for 7 days and C for 9 days. The ratio of their daily wages is 4 : 3 : 2, and their total income is Rs. 1,180. The total income of B and C for one day is

A. RS. 100
Posted in:  Time & Work -  Aptitude -  Mathematics

If x men can do a piece of work in 8 days and (x+4) men can do the same work in 6 days, then x is equal to

C. 12
Posted in:  Time & Work -  Aptitude -  Mathematics

A man, a woman or a boy can do a piece of work in 3, 4 and 12 days respectively. How many boys must assist one man and one woman to do the work in one days ?

A. 5
Posted in:  Time & Work -  Aptitude -  Mathematics