A can complete a work in 10 days, while B can complete the same work in 15 days. How long will it take for both A and B to complete the work together?

A. 6 DAYS
Posted in:  Time & Work -  Aptitude -  Mathematics

If a work can be done by 4 men in 10 days, how many men are required to complete the same work in 5 days?

B. 8 MEN
Posted in:  Time & Work -  Aptitude -  Mathematics

A can do a work in 24 days, B can do the same work in 18 days, and C can do it in 12 days. If they work together, how long will it take to complete the work?

C. 6 DAYS
Posted in:  Time & Work -  Aptitude -  Mathematics

A can do a work in 20 days, B can do the same work in 30 days. If they work together for 10 days, how much of the work is left?

A. 1/3
Posted in:  Time & Work -  Aptitude -  Mathematics

If a pipe can fill a tank in 6 hours and another pipe can empty it in 8 hours, how long will it take to fill the tank if both pipes are opened together?

D. 16 HOURS
Posted in:  Time & Work -  Aptitude -  Mathematics