If a work can be done by 4 men in 15 days, how many men are required to complete the same work in 10 days?

Answer: B. 8 men
Total work is 4 men * 15 days = 60 man-days. To complete in 10 days, required men = 60/10 = 6 men.
Posted in:  Time & Work -  Aptitude -  Mathematics