If A can do a piece of work in 12 days and B can do it in 18 days, how long will it take for both A and B to complete the work together?

Answer: A. 7.2 days
The combined work rate is 1/12 + 1/18 = 5/36. Therefore, the time taken is 36/5 = 7.2 days.