A can do a work in 30 days, B can do it in 45 days. If they work together for 10 days, how much of the work is left?

Answer: A. 1/3
In 10 days, A and B together complete 1/3 of the work, leaving 2/3 of the work remaining.
Posted in:  Time & Work -  Aptitude -  Mathematics