A and B can complete a work in 12 days and 15 days respectively. If they work together for 4 days, how much work is left?

Answer: B. 1/4
A and B together can complete 1/12 + 1/15 = 1/60 of the work in a day. In 4 days, they complete 4/60 = 1/15 of the work, leaving 14/15 of the work.
Posted in:  Time & Work -  Aptitude -  Mathematics